West Fernie Dike Project Update

The design work to extend the 2008 dike construction towards the west is underway.  The engineering consultant, Kerr Wood Leidel, completed their preliminary site survey and identified a proposed location.  The proposal is to maintain the dike’s current position and make some modifications.  The dike would be located away from private property and tied into Hesketh Street.  A community meeting will be held in the future and an information package prepared to help keep the community informed.